Orlando Health West Scaffold

Orlando Health West Scaffold

Orlando, Florida

Suspended Specialty Scaffold

This is a specialty project designed to hoist up 1500lb glass panels with a Beta Max hoist on a rail system. The system allows the construction crew to set panels every four feet.  The Beta Max hoist runs on the 100 foot long track on a couple of beam trolleys made from swing stage beams and set on the roof with swing stage roof rigs.  7800lbs of counterweights were used to secure the system on the roof.

Products Used

Swing Stage Roof Rigs and Beams

Beta Max Hoist

Services Used

Rental and Labor

Location

Orlando, Florida

Contractor

Architectural Aluminum Technologies

Our Gallery

A Glimpse Into Our Construction Masterpieces

contact us for your next rental or installation

Get in touch with us today to book your next rental or schedule a professional installation. Our team is ready to provide reliable solutions tailored to your needs.